1 SENTRUM situates on Lot G, KL Sentral – a development that features contemporary architectural design and seeks to be in harmony with the surrounding KL Sentral development. The 27-storey office tower with a net lettable of 450,000 sq. ft. is also an integral part of the retail mall Nu Sentral. The shape of the floor plate is designed to achieve maximum efficiency and human comfort with optimum energy usage. The core of the tower is strategically placed in the middle for minimum intrusion to the retail space below as well as for allowing panoramic views of KL. Metal louver screens in a chequer design liken to songket weaving, combined with series of horizontal tubes, are extensively used not only as sun-shading devices but also as external aesthetic features, to give a distinct character to the development and simultaneously to provide comfort to the building occupants
Other building features:
– Environmentally friendly design is in accordance with LEED & GBI – VRF Air Conditioning System (Variable Refrigerant Flow)
– Suspended ceiling with T5 energy efficient lighting
– Directly connected to KL Sentral train station
– Raised floor with 110mm clear void
– 12 lifts to be programmed on a floor-by-floor basis and accessed by smart card technology.
Contact for further information / site viewing arrangements:
Vincent Lim : 016-323 1531
e-mail : vincent@gofindoffice.com
Summary of office buildings in the vicinity of KL Sentral:
Office Building | Size availability | Rates |
---|---|---|
1 Sentrum | 4,600sf / 17,000sf / 100,000sf | RM7.80 |
Menara Shell | 15,000sf | RM7.50 |
Menara CIMB | 20,000sf | RM8.50 |
Nu Tower 1 & 2 | 14,000sf | RM7.00 |
1 Sentral | Fully occupied | RM7.50 |
Quill 7 | 5,000sf / 8,000sf | RM7.50 |
Mercu UEM | 12,000sf | RM8.50 |
KL Sentral Park | Fully occupied | RM7.50 |
TH Tower (Plaza Sentral Tower 4) | 6,000sf / 12,000sf / 36,000sf | RM7.30 |
Plaza Sentral 3A & 3B | 2,000sf / 2,500sf | RM6.30 |
Plaza Sentral 2A & 2B | 3,800sf / 3,400sf | RM6.20 |
Plaza Sentral 1B | 9,000sf | RM6.50 |
Q Sentral | Target completion June 2015 | RM7.50 |